Project Name |
Rayonier 2010 Outage |
| |
|
Background
Information:
|
- Location: Fernandina Beach, Florida
- Contract Value: $352,200.00
|
| |
|
Description
|
- Replace 4 3c 500MCM IAC 5KV feeders
over 500' each for Bleach Plant.
- Installation of one 600 amp 480 volt
three phase section of MCC to existing MCC.
- Installation of conduit and wire to
existing instruments along the paper machine for DCS
expansion.
- Installation of conduit and wire for
automated oil lube system along operators side of paper
machine.
- Installation of conduit and wire to
new safe guarding system on rewinder machine.
- Disconnect and reconnect existing
5KV IAC cables for primary switch replacement on three
transformers.
- Remove and reinstall conduit for
bucket elevator replacement at power boiler #6.
|
| |
|
Challenges:
|
- Getting as much completed before
outage and hiring 25 new employees for three week
outage.
|
| |
|
Summary:
|
This was a successful job for White Electrical Construction
Company. We met Rayonier's schedule for completing each task
at different times during the outage. |
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|