Project Name: |
Georgia
Power - Plant Harlee Branch Cooling Tower |
| |
|
Description:
|
White Electrical contractors installed all aspects of electrical work on
construction of a 950' x 100', 32-ceil cooling tower with an
intake and discharge structure. |
| |
|
Unique Job
Conditions:
|
- The largest fiberglass cooling
tower ever constructed at the time of completion.
- This project had liquidated damages
of $2,500.00 per day.
- Finished project ahead of schedule.
- Required major scheduling between
White Electrical and the mechanical contractors on site
to maintain the original schedule.
|
| |
|
Services
Provided:
|
Installation of:
- All cable tray systems, fiberglass and aluminum.
- All grounding and lightning protection systems.
- Underground duct banks and manholes.
- And setting all transformers and gear, low and high
voltage.
- All lighting and power outlets.
- GAI-tronics public address system.
- Fiber optic link to existing plant.
|
| |
|
Project
Facts:
|
- Total contract, including change
orders, was over $1.25 million.
- Project maintained original schedule
without delays.
- 27 craft workers at peak of project
|
|
|
|
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|